MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://ycyzqzxyh.com
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- Some areas in Metro Manila, Bulacan to have brownouts due to maintenance work
- P1.7-M shabu seized in Taguig buy-bust
- 1 in 4 people lack access to safe drinking water — UN
- 25 countries suspend postal services to US over tariffs – UN
- Lacson clears air over conflict with Marcoleta on flood control probe
- 'Blood Moon' to rise during total lunar eclipse Sunday night
- Comelec upholds cancelation of Duterte Youth registration
- Head of main US health agency abruptly dismissed
- Estrada, Villanueva tagged in House flood control mess, says 'SOP was 30%'
- Modi: India, Japan to 'shape the Asian century'